Solar PV foundation Installation by High Speed Ramming



Using this process we can reduce the time for installation of a foundation required for solar farm to under 1 minute actually and on a average of under 3 minutes per pole of approx 1.75 meter in standard soil conditions


Post time: Jun-13-2017
INQUIRY NOW
  • * CAPTCHA: Please select the Key

WhatsApp Online Chat !