Solar panels just got turned on today! Finally! LG panels Gilbert AZ



The various inspections finally completed and the panels got turned on today. 10.8k system which is 40 LG panels, 270watt each. Even with the air conditioner running the system is still overproducing and putting electric back to SRP grid for later use. I’m quite happy with the overall performance.


Post time: Jul-04-2017
INQUIRY NOW
  • * CAPTCHA: Please select the Star

WhatsApp Online Chat !