Strictly implement connection order and remove the order:
connection order: Battery– LED light –solar panel.

Connection & Debug

1. Connected the solar panel with the LED light source, fix the direction of solar panel,its support and wire connection.

2. Through the light pole and arm support to connected the light line with LED source light.

3. Putting the Battery into waterproof box and through the PVC tube to connected the light line.

4. When hoisting up the light pole, the solar panel must be toward the south (make sure every parts are safe fixed), then fixed the light poly on the foundation.

5.Connected with controller.