Glue-up Station Assembly, Part 3



Building a glue-up station–part 3 in a series: attach the clamp head support to the platform; mount and hang the platform; assemble and attach the vertical rails; build the adjustable clamp bar.

This project appeared in Shop Notes magazine #62, March 2002, which means I cannot post the pattern. However, they posted a PDF of the cutting diagram as an online “Shop Notes Extra”, which can be downloaded here:

http://www.shopnotes.com/files/issues/062/clamping-station.pdf

The glue-up station project requires some hardware which is not listed in the cutting diagram. You will need:
6 Bronze bushings 5/8″ ID, 3/4″ OD, 1″ long
24 Hex nuts 5/8″
18 Flat washers 5/8″
6 Acorn nuts 5/8″
3 Quick release pins 1/4″ x 3 1/2″
6 All-thread steel rods 5/8″ x 15″
Numerous screws of varying types and sizes

And here are more places to find Wood Tools Workshop:

http://www.WoodToolsWorkshop.com

http://wtwshop.com/Instagram

https://plus.google.com/+woodtoolsworkshop

http://wtwshop.com/Twitter

http://wtwshop.com/Facebook


Post time: Feb-06-2017
INQUIRY NOW
  • * CAPTCHA: Please select the Truck

WhatsApp Online Chat !